Eastbay 54 | Superstructure Awlgrip Job

October 2016 kicked off Phase Two of an exterior cosmetic refit on an Eastbay 54. The last time AMELIA4 was in the GIBY Paint Booth, exterior work included refinishing the hull and decks with Awlgrip, this time our team is tackling the boat’s superstructure. Developing long-term relationships with people and their boats through multi-phase projects is one of our GREAT pleasures. To learn more about the extent of Great Island Boat Yard’s previous work on AMELIA4, see our blog post under the REFIT tab.

 img_8571img_8283 img_8285 img_8508 img_8509 img_8510 img_8511 img_8512 img_8579img_8513 img_8514 img_8565 img_8566 img_8572 img_8573

Leave a Reply

Your email address will not be published. Required fields are marked *