Launching & Installing the Docks at GIBY

It’s the last day of March, and our crew was back to work clearing the ice out to the head of Orr’s Cove this morning.  With the tide going out all day, and a blustery Northwest breeze, the conditions were ideal for a thorough ice out.  By afternoon break Jeff, Nate, Tom and Mike had installed both the float and ramp for the fuel dock, as well as several floats and the ramp for “D” dock (the Southernmost t-dock).  The photos show the great progress from morning through the afternoon today.  Hooray for Spring!

Leave a Reply

Your email address will not be published. Required fields are marked *